ایونٹ مینجمنٹ
Wittenborg - University of Applied Sciences · Unknown, the Netherlands
Wittenborg - University of Applied Sciences
Unknown, the Netherlands
ایونٹ مینجمنٹ is a bachelor's degree programme lasting 3 years, taught in English at Wittenborg - University of Applied Sciences in Unknown, with tuition currently recorded as €9,800.
ویٹنبرگ یونیورسٹی میں بی بی اے ایونٹ مینجمنٹ طلباء کو کامیاب ایونٹس کی منصوبہ بندی، تنظیم اور ان پر عمل درآمد کے لیے ضروری مہارتیں فراہم کرتی ہے۔ یہ پروگرام عملی تجربے اور نظری علم پر زور دیتا ہے، گریجویٹس کو ایونٹس کی صنعت میں متحرک کیریئر کے لیے تیار کرتا ہے۔
Programme-specific requirements recorded in SIT Connect.
- Completed secondary/high-school education with good grades in relevant subjects, or an equivalent qualification / recognised foundation or pathway programme.
Proof of English proficiency — typically IELTS, TOEFL, PTE, Duolingo or equivalent (see the minimum scores listed). A Medium-of-Instruction (MOI) letter may be accepted in place of a test by some institutions.
Programme-specific document list.
Review the verified facts and degree-level requirements.
SIT Connect reviews your education and language background.
Complete the university-specific checklist and translations.
Continue to the central application portal.
Frequently asked questions
How long is ایونٹ مینجمنٹ?
The official catalogue records a duration of 3 years.
Which languages are used for ایونٹ مینجمنٹ?
The official programme record lists English. A required language certificate or minimum score must be confirmed for the chosen intake.
What is the tuition fee?
€9,800 is the tuition currently recorded in SIT Connect. Currency conversions on this page are estimates.
Can I apply now?
Yes. SIT Connect currently has an application-ready intake for this programme.
More programs at Wittenborg - University of Applied Sciences
Bachelor's Degreeمصنوعی ذہانت اور سائبر سیکیورٹی
Intake dates for this programme have not been confirmed yet.
Bachelor's Degreeبزنس اینالٹکس
Intake dates for this programme have not been confirmed yet.
Foundation